In summer 2017 our customer approached us with a request for an offer about a free standing mast. Nobody imagined that this would result in the most comprehensive project of the company so far.
Already in August we received the order with challenging aims:
The mast should be erected until end of 2017
The foundation was already built and did not fulfill our requirements
We accepted the challenge and started by developing a transition piece for the old foundation and the new mast with 110m height. From the very beginning our client made perfectly clear that only the highest quality standards would be accepted. All planning and production would be closely monitored by them.
With delight we accomplished these tasks and fulfilled all quality requirements.
In October it got exciting: Though we were all working under high pressure the erection in 2017 seemed not possible. To fulfill our customer’s request we all worked even harder and the delivery of the first part of the mast in calendar week 49 was made possible.
Start of December the crane for the erection was ordered, the mast was assembled in two large sections on the ground and on Friday the 15th of December 2017 the moment was there: The mast was successfully erected.
Ge:Net GmbH
Am Rollberg 1
38678 Clausthal-Zellerfeld
Telefon: +49 (5323) 9486-55
Telefax: +49 (5323) 9486-56
http://www.genetworld.com
Geschäftsführer
Telefon: +49 (5323) 9486-55
Fax: +49 (5323) 9486-56
E-Mail: Ropeter@genetworld.com
PR
Telefon: +49 (5323) 9486-59
Fax: +49 (5323) 9486-56
E-Mail: cornelia.ropeter@genetworld.com