TerraX Minerals Inc. (TSX-V: TXR; Frankfurt: TX0; OTC Pink: TRXXF – https://www.youtube.com/watch?v=kLSt_VpUzmw&t=4s ) is pleased to announce assay results from the remaining 11 holes drilled at the Yellowknife City Gold project this winter.  Four of these holes (1,170 m) were drilled on the high-grade Crestaurum gold bearing structure to test whether gold mineralization continued to depth.   All four holes hit mineralized structure, with two holes containing visible gold. All holes intersected significant gold with selected intervals of:

  • 84 g/t Au over 2.49 m and 5.38 g/t Au over 0.63 m in hole TCR18-076
  • 08 g/t Au over 2.80m, and 5.57 g/t Au over 2.06 m, in hole TCR18-078
  • 30 g/t Au over 1.24 m, and 4.41 g/t Au over 0.80 m, in hole TCR18-079
  • 86 g/t Au over 0.56 m in hole TCR18-077

The upper portion of the Crestaurum structure has been previously drilled with 187 drill holes over 1.4 kilometers of strike length, from surface down to a depth of approximately 100-150 meters depth, outlining a lode style shear and vein deposit (including 5.00 m @ 62.90 g/t Au, news release October 2, 2013). Although the structure is very continuous the high grade lodes are more discrete and these initial widespread deeper holes were designed to intersect structure to determine whether there was probability of high grade lodes continuing at depth potentially doubling the size of the mineralized zones.  A drill hole location map can be found here and a long section of the Crestaurum main shear are available here.

Joe Campbell, CEO of TerraX, states “This small program of four holes successfully demonstrated that the Crestaurum zone continues at depth on multiple surfaces, potentially doubling the size of the zone. The 300 meter vertical depth tested with these holes is still considered very shallow for Archean lode gold deposits and mineralization remains open for further expansion, both along strike and at depth.” 

TerraX also tested the Sam Otto west zone, another lode style shear and vein deposit near TerraX’s Sam Otto Main zone (1.90 m @ 13 96 g/t Au, news release May 2, 2017). This drilling included 5 holes totaling 2,081 m testing strike and depth potential (down to 250 meters vertical) on this zone. All holes hit gold mineralized structure with best results of 3.00 g/t Au over 2.69 m in hole TSO18-038, 1.06 g/t Au over 4.00 m in hole TSO18-041, and 1.32 g/t Au over 2.70 m in hole TSO18-036. All holes included intersections of 2.0 to 5.6 meters of 0.71 to 0.81 g/t Au. The continuous presence of the gold mineralized structures that now extend over more than a kilometer of strike and 250 meters of depth, with alteration and mineralization styles like the high grade zones from the nearby Con and Giant mines, makes this a good target for continued exploration.

A single hole (TSO18-039, 430 meters) was drilled approximately 500 m south along strike from the Sam Otto Main zone, and 600 meters north of TSO18-037 (1.92 g/t Au over 11.52 meters, news release Mach 9, 2018). This hole confirmed the continuity of the Sam Otto structure between the known extents of the Sam Otto Main and Sam Otto South zones, intersecting a broad zone of deformation and alteration (0.10 g/t Au over 157.75 m) consistent with the Sam Otto style of mineralization, including multiple 2.50 m – 9.10 m wide zones of 0.35 g/t Au – 0.82 g/t Au.

All holes were drilled approximately normal to projected strike and dip of the zones of mineralization and are interpreted to be approximately 80-95% of true thickness 

TerraX Minerals Inc. (TSX-V: TXR; Frankfurt: TX0; OTC Pink: TRXXF – https://www.youtube.com/watch?v=kLSt_VpUzmw&t=4s ) is pleased to announce assay results from the remaining 11 holes drilled at the Yellowknife City Gold project this winter.  Four of these holes (1,170 m) were drilled on the high-grade Crestaurum gold bearing structure to test whether gold mineralization continued to depth.   All four holes hit mineralized structure, with two holes containing visible gold. All holes intersected significant gold with selected intervals of:

  • 84 g/t Au over 2.49 m and 5.38 g/t Au over 0.63 m in hole TCR18-076
  • 08 g/t Au over 2.80m, and 5.57 g/t Au over 2.06 m, in hole TCR18-078
  • 30 g/t Au over 1.24 m, and 4.41 g/t Au over 0.80 m, in hole TCR18-079
  • 86 g/t Au over 0.56 m in hole TCR18-077

The upper portion of the Crestaurum structure has been previously drilled with 187 drill holes over 1.4 kilometers of strike length, from surface down to a depth of approximately 100-150 meters depth, outlining a lode style shear and vein deposit (including 5.00 m @ 62.90 g/t Au, news release October 2, 2013). Although the structure is very continuous the high grade lodes are more discrete and these initial widespread deeper holes were designed to intersect structure to determine whether there was probability of high grade lodes continuing at depth potentially doubling the size of the mineralized zones.  A drill hole location map can be found here and a long section of the Crestaurum main shear are available here.

Joe Campbell, CEO of TerraX, states “This small program of four holes successfully demonstrated that the Crestaurum zone continues at depth on multiple surfaces, potentially doubling the size of the zone. The 300 meter vertical depth tested with these holes is still considered very shallow for Archean lode gold deposits and mineralization remains open for further expansion, both along strike and at depth.” 

TerraX also tested the Sam Otto west zone, another lode style shear and vein deposit near TerraX’s Sam Otto Main zone (1.90 m @ 13 96 g/t Au, news release May 2, 2017). This drilling included 5 holes totaling 2,081 m testing strike and depth potential (down to 250 meters vertical) on this zone. All holes hit gold mineralized structure with best results of 3.00 g/t Au over 2.69 m in hole TSO18-038, 1.06 g/t Au over 4.00 m in hole TSO18-041, and 1.32 g/t Au over 2.70 m in hole TSO18-036. All holes included intersections of 2.0 to 5.6 meters of 0.71 to 0.81 g/t Au. The continuous presence of the gold mineralized structures that now extend over more than a kilometer of strike and 250 meters of depth, with alteration and mineralization styles like the high grade zones from the nearby Con and Giant mines, makes this a good target for continued exploration.

A single hole (TSO18-039, 430 meters) was drilled approximately 500 m south along strike from the Sam Otto Main zone, and 600 meters north of TSO18-037 (1.92 g/t Au over 11.52 meters, news release Mach 9, 2018). This hole confirmed the continuity of the Sam Otto structure between the known extents of the Sam Otto Main and Sam Otto South zones, intersecting a broad zone of deformation and alteration (0.10 g/t Au over 157.75 m) consistent with the Sam Otto style of mineralization, including multiple 2.50 m – 9.10 m wide zones of 0.35 g/t Au – 0.82 g/t Au.

All holes were drilled approximately normal to projected strike and dip of the zones of mineralization and are interpreted to be approximately 80-95% of true thickness 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains forward-looking information, which involves known and unknown risks, uncertainties and other factors that may cause actual events to differ materially from current expectation. Important factors – including the availability of funds, the results of financing efforts, the completion of due diligence and the results of exploration activities – that could cause actual results to differ materially from the Company’s expectations are disclosed in the Company’s documents filed from time to time on SEDAR (see www.sedar.com). Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date of this press release. The company disclaims any intention or obligation, except to the extent required by law, to update or revise any forward-looking statements, whether as a result of new information, events or otherwise.

Firmenkontakt und Herausgeber der Meldung:

Swiss Resource Capital AG
Poststrasse 1
CH9100 Herisau
Telefon: +41 (71) 354-8501
Telefax: +41 (71) 560-4271
http://www.resource-capital.ch

Ansprechpartner:
Jochen Staiger
CEO
Telefon: +41 (71) 3548501
E-Mail: js@resource-capital.ch
Für die oben stehende Pressemitteilung ist allein der jeweils angegebene Herausgeber (siehe Firmenkontakt oben) verantwortlich. Dieser ist in der Regel auch Urheber des Pressetextes, sowie der angehängten Bild-, Ton-, Video-, Medien- und Informationsmaterialien. Die United News Network GmbH übernimmt keine Haftung für die Korrektheit oder Vollständigkeit der dargestellten Meldung. Auch bei Übertragungsfehlern oder anderen Störungen haftet sie nur im Fall von Vorsatz oder grober Fahrlässigkeit. Die Nutzung von hier archivierten Informationen zur Eigeninformation und redaktionellen Weiterverarbeitung ist in der Regel kostenfrei. Bitte klären Sie vor einer Weiterverwendung urheberrechtliche Fragen mit dem angegebenen Herausgeber. Eine systematische Speicherung dieser Daten sowie die Verwendung auch von Teilen dieses Datenbankwerks sind nur mit schriftlicher Genehmigung durch die United News Network GmbH gestattet.