Staadskanaal is the fourth project of Goldbeck Solar, which the EPC company will carry out with Chint Solar. The construction already in full swing so that the solar park can be connected to the grid in autumn 2020.

Completion planned for autumn 2020

As with the Midden-Groningen solar park, Chint Solar is also relying on Goldbeck Solar’s experience for its next project, which will once again act as general contractor for the group. The new solar park is to be built on an area of more than 100 hectares near Groningen and will ultimately have an installed capacity of 101 MWp. In this project Astronergy mono Perc half cut modules with 410 Watt are used.

As with the Midden-Groningen solar park, Goldbeck Solar once again relies on Greencells as a cooperation partner to successfully implement this ambitious project. The groundbreaking ceremony marked in March the start of the solar park, which is scheduled to be completed and connected to the grid within eight months. To ensure smooth operations, it is above all necessary to coordinate numerous trades to enable the grid connection in October. On the grid connection side, Chint Solar is therefore again relying on cooperation with ABB.

"In the Netherlands, several solar parks for Chint Solar have already been built and put into operation. We appreciate Chint`s trust in our experience of the full EPC and O+M services of Multi Megawatt solar parcs and looking forward to connect Staadskanaal within the planned time," summarised Tobias Friedrich, Head of Solar Netherlands for Goldbeck Solar.

Green energy for at least 50,000 households

After successful completion in autumn 2020, Staadskanaal, together with Buinerveen, will have a total capacity of 146 MWp. This makes the project the largest in the BeNeLux countries with a direct connection point to the TenneT high-voltage grid. Once the solar park is officially opened, it will supply at least 50,000 households in the Netherlands with green energy. In this way, annual CO2 emissions can be reduced by 60,000 tons.

Learn more about Goldbeck Solar at www.goldbecksolar.com.

Firmenkontakt und Herausgeber der Meldung:

GOLDBECK Solar GmbH
Goldbeckstr. 7
69493 Hirschberg an der Bergstraße
Telefon: +49 (6201) 7103099
Telefax: +49 (6201) 87775509
https://goldbecksolar.com

Ansprechpartner:
Yesica Pantiga
Marketing
Telefon: +49 (6201) 7103337
E-Mail: yesica.pantiga@goldbecksolar.com
Für die oben stehende Pressemitteilung ist allein der jeweils angegebene Herausgeber (siehe Firmenkontakt oben) verantwortlich. Dieser ist in der Regel auch Urheber des Pressetextes, sowie der angehängten Bild-, Ton-, Video-, Medien- und Informationsmaterialien. Die United News Network GmbH übernimmt keine Haftung für die Korrektheit oder Vollständigkeit der dargestellten Meldung. Auch bei Übertragungsfehlern oder anderen Störungen haftet sie nur im Fall von Vorsatz oder grober Fahrlässigkeit. Die Nutzung von hier archivierten Informationen zur Eigeninformation und redaktionellen Weiterverarbeitung ist in der Regel kostenfrei. Bitte klären Sie vor einer Weiterverwendung urheberrechtliche Fragen mit dem angegebenen Herausgeber. Eine systematische Speicherung dieser Daten sowie die Verwendung auch von Teilen dieses Datenbankwerks sind nur mit schriftlicher Genehmigung durch die United News Network GmbH gestattet.

counterpixel